Our Process for Custom Kitchen Remodeling in the D.C. Metro Region

At Zen Renovations, our custom kitchen remodeling process begins with listening. We focus on your priorities, ensuring every step is guided by your experience so you can engage creatively as your space takes shape.
As a DC Design Build Remodeler, our in-house team manages your renovation from first sketch to final paint stroke. We provide budget-first transparency, ensuring every design and financial decision remains aligned throughout. At Zen, we live and work in Washington, DC, and Montgomery County, giving us the local expertise to navigate historic guidelines and permitting efficiently, keeping your kitchen renovation on schedule.
Ready to explore what's possible? Schedule a complimentary 30-minute video consultation to discuss your kitchen renovation.
Our Zen Design+Build Process
Calm by design, our process provides clarity, structure, and focus. You make the decisions, we guide the experience. The result is a kitchen that works beautifully for how you live.
Step 1: Initial Consultation
Our design-build process begins with a 30-minute call to review your goals and confirm alignment. If it's a fit, we schedule an on-site visit to explore your space, take measurements, and identify opportunities within your budget
Complimentary Kitchen Mock-Up
Before any contract, we have the ability to offer potential clients a 3D design rendering using our photorealistic Chief Architect system. This allows homeowners to experience the layout, light and flow of a potential kitchen design, before even signing a contract.
Step 2: Design
As a design+build firm, design decisions, pricing, and construction planning happen together, not in separate phases.
The first step is to sign a design agreement. The design agreement sets out the scope of work for the project as well as an estimated budget. The scope often includes new cabinetry, countertop and backslash. Often a wall is removed between the kitchen and a dining room. Recessed lighting and pendant lighting are frequently added, and wood floors are replaced and/or refinished. At every decision point, we provide clear financial guidance so the plan stays aligned with your investment.
View our kitchen pricing guide to see typical investment levels.
Your designer guides your renovation through two phases. Your design timeline varies by project scope and includes meetings (in-person and virtual), drawings, preparation of inspiration boards, vendor coordination, and material selections.
Phase 1: Schematic Layout
We meet to establish design objectives and understand your preferred style. Your designer measures the space, prepares drawings, and analyzes structural constraints, including wall modifications and plumbing relocation impacts. You review layout options, provide feedback, and sign off on the final schematic.
Phase 2: Detailed Finish Selections
Working with Crystal Cabinetry and preferred vendors, your designer guides selections for:
- Cabinetry and hardware
- Countertops
- Wall and flooring tile
- Plumbing fixtures
- Lighting
- Paint palette